Focalpoint Logo 01

Smartpond Logo 1024 1

CASE STUDY: Cedar Sports Complex

A great display of LID/GSI for this large parking area and shows the comparison between large footprint traditional bioretention and small footprint innovative biofiltration

PRODUCT PROFILE: smartPOND

The future of stormwater is automated, through controls, sensors and telemetry, we will soon change the way stormwater is managed. A move from passive control to active control is on the horizon.

CASE STUDY: ASCE HQ LID-Based Parking Lot

From biofiltration to permeable pavers, the ASCE can now show off its own parking lot to visitors, showing them exactly how simple and cost-effective LID can be.

CASE STUDY: Automated Batch Detention

The development is split into two main sections, each with a detention pond using a innovative automated batch detention system called smartPOND.